com.badlogic.gdx.ai.sched.Scheduler Maven / Gradle / Ivy
/*******************************************************************************
* Copyright 2014 See AUTHORS file.
*
* Licensed under the Apache License, Version 2.0 (the "License");
* you may not use this file except in compliance with the License.
* You may obtain a copy of the License at
*
* http://www.apache.org/licenses/LICENSE-2.0
*
* Unless required by applicable law or agreed to in writing, software
* distributed under the License is distributed on an "AS IS" BASIS,
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
* See the License for the specific language governing permissions and
* limitations under the License.
******************************************************************************/
package com.badlogic.gdx.ai.sched;
/** A {@code Scheduler} works by assigning a pot of execution time among a variety of tasks, based on which ones need the time.
*
* Different AI tasks can and should be run at different frequencies. You can simply schedule some tasks to run every few frames
* and other tasks to run more frequently, slicing up the overall AI and distributing it over time. It is a powerful technique for
* making sure that the game doesn't take too much AI time overall.
*
* The tasks that get called are passed timing information so they can decide when to stop running and return. However, note that
* there is nothing to stop a task from running for as long as it wants. The scheduler trusts that they will be well behaved.
*
* Notes:
*
* - Hierarchical Scheduling: {@code Scheduler} extends the {@link Schedulable} interface, allowing a scheduling system to
* be run as a task by another scheduler. This technique is known as hierarchical scheduling. Also, it's worth noting that with a
* hierarchical approach, there's no reason why the schedulers at different levels should be of the same kind. For instance, it is
* possible to use a frequency-based scheduler for the whole game and priority-based schedulers for individual characters.
* - Level of Detail: On its own there is nothing that hierarchical scheduling provides that a single scheduler cannot
* handle. It comes into its own when used in combination with level of detail (LOD) systems. Level of detail systems are behavior
* selectors; they choose only one behavior to run. In a hierarchical structure this means that schedulers running the whole game
* don't need to know which behavior each character is running. A flat structure would mean removing and registering behaviors
* with the main scheduler each time.
*
*
* @author davebaol */
public interface Scheduler extends Schedulable {
/** Adds the {@code schedulable} to the list using the given {@code frequency} and a phase calculated by this scheduler.
* @param schedulable the task to schedule
* @param frequency the frequency */
public void addWithAutomaticPhasing (Schedulable schedulable, int frequency);
/** Adds the {@code schedulable} to the list using the given {@code frequency} and {@code phase}
* @param schedulable the task to schedule
* @param frequency the frequency
* @param phase the phase */
public void add (Schedulable schedulable, int frequency, int phase);
}
© 2015 - 2024 Weber Informatics LLC | Privacy Policy