All Downloads are FREE. Search and download functionalities are using the official Maven repository.

g0501_0600.s0502_ipo.readme.md Maven / Gradle / Ivy

There is a newer version: 1.30
Show newest version
502\. IPO

Hard

Suppose LeetCode will start its **IPO** soon. In order to sell a good price of its shares to Venture Capital, LeetCode would like to work on some projects to increase its capital before the **IPO**. Since it has limited resources, it can only finish at most `k` distinct projects before the **IPO**. Help LeetCode design the best way to maximize its total capital after finishing at most `k` distinct projects.

You are given `n` projects where the ith project has a pure profit `profits[i]` and a minimum capital of `capital[i]` is needed to start it.

Initially, you have `w` capital. When you finish a project, you will obtain its pure profit and the profit will be added to your total capital.

Pick a list of **at most** `k` distinct projects from given projects to **maximize your final capital**, and return _the final maximized capital_.

The answer is guaranteed to fit in a 32-bit signed integer.

**Example 1:**

**Input:** k = 2, w = 0, profits = [1,2,3], capital = [0,1,1]

**Output:** 4

**Explanation:** Since your initial capital is 0, you can only start the project indexed 0. After finishing it you will obtain profit 1 and your capital becomes 1. With capital 1, you can either start the project indexed 1 or the project indexed 2. Since you can choose at most 2 projects, you need to finish the project indexed 2 to get the maximum capital. Therefore, output the final maximized capital, which is 0 + 1 + 3 = 4.

**Example 2:**

**Input:** k = 3, w = 0, profits = [1,2,3], capital = [0,1,2]

**Output:** 6

**Constraints:**

*   1 <= k <= 105
*   0 <= w <= 109
*   `n == profits.length`
*   `n == capital.length`
*   1 <= n <= 105
*   0 <= profits[i] <= 104
*   0 <= capital[i] <= 109




© 2015 - 2024 Weber Informatics LLC | Privacy Policy