All Downloads are FREE. Search and download functionalities are using the official Maven repository.

contract.fa.codelist.standard.UNECE_DeliveryPlanCommitmentLevelCode_D16A.xsd Maven / Gradle / Ivy












  





  
    
      
        
          
            Firm
            Indicates that the scheduling information is a firm commitment.
          
        
      
      
        
          
            Commitment for manufacturing and material
            Authorizes the supplier to start the manufacturing of goods.
          
        
      
      
        
          
            Commitment for material
            Authorizes the manufacturer to order material required for manufacturing specified goods.
          
        
      
      
        
          
            Planning/forecast
            An estimate of future requirements based on trends and actual information.
          
        
      
      
        
          
            Short delivered on previous delivery
            Part of a consignment which was not delivered when the original delivery was made.
          
        
      
      
        
          
            Capacity available
            Capacity is available to meet the requested scheduling demands.
          
        
      
      
        
          
            Promotion
            All related schedule information refer to a promotion.
          
        
      
      
        
          
            Special demand
            All related schedule information refers to a special demand.
          
        
      
      
        
          
            User defined
            The user can interpret the meaning of the values from information exchanged previously.
          
        
      
      
        
          
            Immediate
            Indicates that the scheduling information is for immediate execution.
          
        
      
      
        
          
            Pilot/Pre-volume
            Initial products required in advance of the normal production process.
          
        
      
      
        
          
            Planning
            An estimate of future requirements.
          
        
      
      
        
          
            Potential order increase
            The possibility and magnitude of a schedule fluctuation.
          
        
      
      
        
          
            Average plant usage
            The usual amount that a manufacturing facility will use over a specified duration.
          
        
      
      
        
          
            First time reported firm
            Initial confirmation of a material requirement.
          
        
      
      
        
          
            Maximum
            The highest attainable amount.
          
        
      
      
        
          
            Tooling capacity
            The maximum amount that the process was designed to accommodate.
          
        
      
      
        
          
            Normal tooling capacity
            The anticipated amount that the process was designed to accommodate over a specific period of time.
          
        
      
      
        
          
            Prototype
            The preliminary version of a product or service.
          
        
      
      
        
          
            Strike protection
            Product level that is set aside as protection in the event of a work stoppage.
          
        
      
      
        
          
            Required tooling capacity
            The contracted amount that the process was designed to accommodate over a specific period of time.
          
        
      
      
        
          
            Deliver to schedule
            Deliver to schedule separately supplied.
          
        
      
      
        
          
            Await manual pull
            Await non-EDI instruction before shipping.
          
        
      
      
        
          
            Reference to commercial agreement between partners
            The buyer's commitment is the one defined in the commercial agreement.
          
        
      
      
        
          
            Proposed
            Indicates that the scheduling information is a proposal.
          
        
      
    
  





© 2015 - 2024 Weber Informatics LLC | Privacy Policy