Library that provides facilities to allow project information to be manipulated in Java and .Net. Supports a range of data formats: Microsoft Project Exchange (MPX), Microsoft Project (MPP,MPT), Microsoft Project Data Interchange (MSPDI XML), Microsoft Project Database (MPD), Planner (XML), Primavera (PM XML, XER, and database), Asta Powerproject (PP, MDB), Asta Easyplan (PP), Phoenix Project Manager (PPX), FastTrack Schedule (FTS), and the Standard Data Exchange Format (SDEF).
The newest version!
/*
* file: ProjectConfig.java
* author: Jon Iles
* copyright: (c) Packwood Software 2002-2015
* date: 20/04/2015
*/
/*
* This library is free software; you can redistribute it and/or modify it
* under the terms of the GNU Lesser General Public License as published by the
* Free Software Foundation; either version 2.1 of the License, or (at your
* option) any later version.
*
* This library is distributed in the hope that it will be useful, but
* WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY
* or FITNESS FOR A PARTICULAR PURPOSE. See the GNU Lesser General Public
* License for more details.
*
* You should have received a copy of the GNU Lesser General Public License
* along with this library; if not, write to the Free Software Foundation, Inc.,
* 59 Temple Place, Suite 330, Boston, MA 02111-1307, USA.
*/
package net.sf.mpxj;
import java.io.File;
/**
* Container for configuration details used to control the behaviour of the ProjectFile class.
*/
public class ProjectConfig
{
/**
* Used to set whether WBS numbers are automatically created.
*
* @param flag true if automatic WBS required.
*/
public void setAutoWBS(boolean flag)
{
m_autoWBS = flag;
}
/**
* Used to set whether outline level numbers are automatically created.
*
* @param flag true if automatic outline level required.
*/
public void setAutoOutlineLevel(boolean flag)
{
m_autoOutlineLevel = flag;
}
/**
* Used to set whether outline numbers are automatically created.
*
* @param flag true if automatic outline number required.
*/
public void setAutoOutlineNumber(boolean flag)
{
m_autoOutlineNumber = flag;
}
/**
* Used to set whether the task unique ID field is automatically populated.
*
* @param flag true if automatic unique ID required.
*/
public void setAutoTaskUniqueID(boolean flag)
{
m_autoTaskUniqueID = flag;
}
/**
* Used to set whether the calendar unique ID field is automatically populated.
*
* @param flag true if automatic unique ID required.
*/
public void setAutoCalendarUniqueID(boolean flag)
{
m_autoCalendarUniqueID = flag;
}
/**
* Used to set whether the assignment unique ID field is automatically populated.
*
* @param flag true if automatic unique ID required.
*/
public void setAutoAssignmentUniqueID(boolean flag)
{
m_autoAssignmentUniqueID = flag;
}
/**
* Used to set whether the task ID field is automatically populated.
*
* @param flag true if automatic ID required.
*/
public void setAutoTaskID(boolean flag)
{
m_autoTaskID = flag;
}
/**
* Retrieve the flag that determines whether WBS is generated
* automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoWBS()
{
return m_autoWBS;
}
/**
* Retrieve the flag that determines whether outline level is generated
* automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoOutlineLevel()
{
return m_autoOutlineLevel;
}
/**
* Retrieve the flag that determines whether outline numbers are generated
* automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoOutlineNumber()
{
return m_autoOutlineNumber;
}
/**
* Retrieve the flag that determines whether the task unique ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoTaskUniqueID()
{
return m_autoTaskUniqueID;
}
/**
* Retrieve the flag that determines whether the calendar unique ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoCalendarUniqueID()
{
return m_autoCalendarUniqueID;
}
/**
* Retrieve the flag that determines whether the assignment unique ID
* is generated automatically.
*
* @return boolean, default is true.
*/
public boolean getAutoAssignmentUniqueID()
{
return m_autoAssignmentUniqueID;
}
/**
* Retrieve the flag that determines whether the task ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoTaskID()
{
return m_autoTaskID;
}
/**
* Used to set whether the resource unique ID field is automatically populated.
*
* @param flag true if automatic unique ID required.
*/
public void setAutoResourceUniqueID(boolean flag)
{
m_autoResourceUniqueID = flag;
}
/**
* Used to set whether the resource ID field is automatically populated.
*
* @param flag true if automatic ID required.
*/
public void setAutoResourceID(boolean flag)
{
m_autoResourceID = flag;
}
/**
* Retrieve the flag that determines whether the resource unique ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoResourceUniqueID()
{
return m_autoResourceUniqueID;
}
/**
* Retrieve the flag that determines whether the resource ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoResourceID()
{
return m_autoResourceID;
}
/**
* Used to set whether the relation unique ID field is automatically populated.
*
* @param flag true if automatic unique ID required.
*/
public void setAutoRelationUniqueID(boolean flag)
{
m_autoRelationUniqueID = flag;
}
/**
* Retrieve the flag that determines whether the relation unique ID
* is generated automatically.
*
* @return boolean, default is false.
*/
public boolean getAutoRelationUniqueID()
{
return m_autoRelationUniqueID;
}
/**
* Returns true if a task's Complete Through attribute is reported as
* the time work can next start. Defaults to false. When set to true this
* matches the behaviour of MS Project versions prior to 2007.
*
* @return true if Complete Through is next work start date
*/
public boolean getCompleteThroughIsNextWorkStart()
{
return m_completeThroughIsNextWorkStart;
}
/**
* When set to true a task's Complete Through attribute is reported as
* the time work can next start. Defaults to false. When set to true this
* matches the behaviour of MS Project versions prior to 2007.
*
* @param completeThroughIsNextWorkStart true if Complete Through is next work start date
*/
public void setCompleteThroughIsNextWorkStart(boolean completeThroughIsNextWorkStart)
{
m_completeThroughIsNextWorkStart = completeThroughIsNextWorkStart;
}
/**
* Retrieve the strategy used by this project to populate baseline attributes from another schedule.
*
* @return baseline strategy
*/
public BaselineStrategy getBaselineStrategy()
{
return m_baselineStrategy;
}
/**
* Set the strategy used by this project to populate baseline attributes from another schedule.
*
* @param strategy baseline strategy
*/
public void setBaselineStrategy(BaselineStrategy strategy)
{
m_baselineStrategy = strategy;
}
/**
* Specify a directory to use when searching for subproject files to expand.
* MPXJ will attempt to use the full path of a subproject when attempting
* to expand it, or the process working directory. If a value
* is supplied here, this directory will be used instead of the process
* working directory.
*
* @param workingDirectory directory to search for subproject files
*/
public void setSubprojectWorkingDirectory(File workingDirectory)
{
m_subprojectWorkingDirectory = workingDirectory;
}
/**
* Retrieve the directory to search for subproject files.
*
* @return directory to search for subproject files
*/
public File getSubprojectWorkingDirectory()
{
return m_subprojectWorkingDirectory;
}
/**
* Indicating whether WBS value should be calculated on creation, or will
* be manually set.
*/
private boolean m_autoWBS = true;
/**
* Indicating whether the Outline Level value should be calculated on
* creation, or will be manually set.
*/
private boolean m_autoOutlineLevel = true;
/**
* Indicating whether the Outline Number value should be calculated on
* creation, or will be manually set.
*/
private boolean m_autoOutlineNumber = true;
/**
* Indicating whether the unique ID of a task should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoTaskUniqueID = true;
/**
* Indicating whether the unique ID of a calendar should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoCalendarUniqueID = true;
/**
* Indicating whether the unique ID of an assignment should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoAssignmentUniqueID = true;
/**
* Indicating whether the ID of a task should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoTaskID = true;
/**
* Indicating whether the unique ID of a resource should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoResourceUniqueID = true;
/**
* Indicating whether the ID of a resource should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoResourceID = true;
/**
* Indicating whether the unique ID of a relation should be
* calculated on creation, or will be manually set.
*/
private boolean m_autoRelationUniqueID = true;
/**
* Set to true provides compatibility with MS Project versions prior to 2007.
*/
private boolean m_completeThroughIsNextWorkStart;
private BaselineStrategy m_baselineStrategy = DefaultBaselineStrategy.INSTANCE;
private File m_subprojectWorkingDirectory;
}