org.aspectj.ajde.ui.swing.DefaultBuildProgressMonitor Maven / Gradle / Ivy
Go to download
Show more of this group Show more artifacts with this name
Show all versions of aspectjtools Show documentation
Show all versions of aspectjtools Show documentation
Tools from the AspectJ project
/* *******************************************************************
* Copyright (c) 1999-2001 Xerox Corporation,
* 2002 Palo Alto Research Center, Incorporated (PARC).
* All rights reserved.
* This program and the accompanying materials are made available
* under the terms of the Eclipse Public License v 2.0
* which accompanies this distribution and is available at
* https://www.eclipse.org/org/documents/epl-2.0/EPL-2.0.txt
*
* Contributors:
* Xerox/PARC initial implementation
* Helen Hawkins Converted to new interface (bug 148190)
* ******************************************************************/
package org.aspectj.ajde.ui.swing;
import java.awt.Frame;
import javax.swing.JDialog;
import org.aspectj.ajde.Ajde;
import org.aspectj.ajde.core.IBuildProgressMonitor;
/**
* This dialog box is open while ajc is compiling the system and displays
* a corresponding progress bar.
*
* @author Mik Kersten
*/
public class DefaultBuildProgressMonitor extends Thread implements IBuildProgressMonitor {
public static final String PROGRESS_HEADING = "AspectJ Build";
private BuildProgressPanel progressDialog = null;
private JDialog dialog = null;
public DefaultBuildProgressMonitor(Frame parent) {
dialog = new JDialog(parent, PROGRESS_HEADING, false);
progressDialog = new BuildProgressPanel();
dialog.setContentPane(progressDialog);
dialog.setSize(550, 120);
try {
dialog.setLocationRelativeTo(parent);
} catch (NoSuchMethodError nsme) {
// running on 1.3
}
}
/**
* Start the progress monitor.
*/
public void begin() {
progressDialog.setProgressBarVal(0);
progressDialog.setProgressText("starting build...");
dialog.setLocationRelativeTo(Ajde.getDefault().getRootFrame());
dialog.setVisible(true);
}
/**
* Sets the label describing the current progress phase.
*/
public void setProgressText(String text) {
progressDialog.setProgressText(text);
}
/**
* Jump the progress bar to the end and finish progress monitoring.
*/
public void finish(boolean wasFullBuild) {
progressDialog.finish();
dialog.dispose();
}
public boolean isCancelRequested() {
return progressDialog.isCancelRequested();
}
public void setProgress(double percentDone) {
progressDialog.setProgressBarVal((int) (percentDone*progressDialog.getProgressBarMax()));
}
}
© 2015 - 2024 Weber Informatics LLC | Privacy Policy