
org.eclipse.ui.progress.IProgressConstants2 Maven / Gradle / Ivy
Show all versions of org.eclipse.ui.workbench Show documentation
/*******************************************************************************
* Copyright (c) 2010 IBM Corporation and others.
* All rights reserved. This program and the accompanying materials
* are made available under the terms of the Eclipse Public License v1.0
* which accompanies this distribution, and is available at
* http://www.eclipse.org/legal/epl-v10.html
*
* Contributors:
* IBM Corporation - initial API and implementation
* Tasktop Technologies - Bug 302529 [UX] [Progress] Show Eclipse IDE progress in the Eclipse icon on the Windows 7 Task Bar
*******************************************************************************/
package org.eclipse.ui.progress;
import org.eclipse.core.runtime.QualifiedName;
import org.eclipse.ui.PlatformUI;
import org.eclipse.ui.progress.IProgressConstants;
/**
* Constants relating to progress UI functionality of the workbench plug-in.
*
* The constants define property keys that are used to associate UI related
* information with Jobs (org.eclipse.core.runtime.jobs.Job
). This
* class is a superset of all previously defined progress constants.
*
* @see org.eclipse.core.runtime.jobs.Job#setProperty
* @see IProgressConstants
* @since 3.6
*
* @noimplement This interface is not intended to be implemented by clients.
*/
public interface IProgressConstants2 extends IProgressConstants {
/**
* Common prefix for properties defined in this interface.
*/
static final String PROPERTY_PREFIX = PlatformUI.PLUGIN_ID
+ ".workbench.progress"; //$NON-NLS-1$
/**
* This property is used to associate a ParameterizedCommand
* with a Job. If the Job is shown in the UI, the command might be
* represented as a button or hyper link to allow the user to trigger a job
* specific action, like showing the Job's results.
*
* Note: Only one of ACTION_PROPERTY
or
* COMMAND_PROPERTY
should be used
*
*
* @see org.eclipse.core.commands.ParameterizedCommand
**/
public static final QualifiedName COMMAND_PROPERTY = new QualifiedName(
PROPERTY_PREFIX, "command"); //$NON-NLS-1$
/**
* This property provides a hint to the progress UI to show the progress of
* the job in the application TaskBar
*
* The property must be of type Boolean
and the hint is used if
* its value is true
.
*
*/
public static final QualifiedName SHOW_IN_TASKBAR_ICON_PROPERTY = new QualifiedName(
PROPERTY_PREFIX, "inTaskBarIcon"); //$NON-NLS-1$
}