package org.openl.util.ce;
import org.openl.util.benchmark.Benchmark;
public interface IActivity extends IDependent{
/**
*
* @return estimated duration of the activity in nano-seconds.
*
* It is obvious that different CPUs provide different performance characteristics.
* At this point we assume that all the measurements are made on 2.6 GHz i5-2450M CPU.
*
*
* It is important to keep it consistent across the application. We recommend to use exact nano-second measures where possible
* (as in {@link System#nanoTime()}). It is still
* This way one day we may use actual measurements vs estimates to improve scheduling. For measurements you may use
* OpenL {@link Benchmark} framework for it provides more reliable measurements.
*
* It is important to understand that this number will affect the quality of the parallel
* scheduling and the total efficiency of the algorithm. It is recommended that you use some close-to-real numbers
* (either available runtime or pre-calculated statically) for estimates. Make them related to the actual size of a problem.
* For example, if an activity parses a table, one might use width * height
as the an estimate factor.
*
* The following two errors will reduce overall algorithm efficiency:
* If your estimate is too low, the algorithm may want to leave the task non-parallel or use low parallelism.
* In case of overestimated problem, the scheduling algorithm will use too short sequences producing too much overhead.
*/
long duration();
}