All Downloads are FREE. Search and download functionalities are using the official Maven repository.

org.apache.sshd.common.future.CancelOption Maven / Gradle / Ivy

Go to download

This artifact provides a single jar that contains all classes required to use remote EJB and JMS, including all dependencies. It is intended for use by those not using maven, maven users should just import the EJB and JMS BOM's instead (shaded JAR's cause lots of problems with maven, as it is very easy to inadvertently end up with different versions on classes on the class path).

There is a newer version: 34.0.0.Final
Show newest version
/*
 * Licensed to the Apache Software Foundation (ASF) under one
 * or more contributor license agreements. See the NOTICE file
 * distributed with this work for additional information
 * regarding copyright ownership. The ASF licenses this file
 * to you under the Apache License, Version 2.0 (the
 * "License"); you may not use this file except in compliance
 * with the License. You may obtain a copy of the License at
 *
 * http://www.apache.org/licenses/LICENSE-2.0
 *
 * Unless required by applicable law or agreed to in writing,
 * software distributed under the License is distributed on an
 * "AS IS" BASIS, WITHOUT WARRANTIES OR CONDITIONS OF ANY
 * KIND, either express or implied. See the License for the
 * specific language governing permissions and limitations
 * under the License.
 */
package org.apache.sshd.common.future;

/**
 * A {@code CancelOption} defines whether a {@link Cancellable} future that is waited upon shall be cancelled if waiting
 * times out or is interrupted.
 *
 * @see VerifiableFuture
 * @see WaitableFuture
 */
public enum CancelOption {

    /**
     * Indicates that when waiting on a future times out, the future shall be canceled.
     */
    CANCEL_ON_TIMEOUT,

    /**
     * Indicates that when waiting on a future is interrupted, the future shall be canceled.
     */
    CANCEL_ON_INTERRUPT,

    /**
     * Indicates that even if waiting on a future times out or is interrupted, it shall not be canceled.
     * 

* {@link #CANCEL_ON_TIMEOUT} and {@link #CANCEL_ON_INTERRUPT} take precedence over this flag. The main purpose of * this flag is to be able to call {@code verify(timeout, NO_CANCELLATION)} to suppress cancelling a future on * time-outs or interrupts altogether. By default, {@code verify(timeout)} will cancel the future on both time-outs * and interrupts. *

*/ NO_CANCELLATION }




© 2015 - 2024 Weber Informatics LLC | Privacy Policy